June in the Okanagan valley was very wet and July started the 
same.  All that water slowed down the build by a couple of weeks.
I have only received part of my order for metal, Spartan 
Metal was backed up with too much work but I didn't need the rest of the
 order anyway.  During the week I went over the design and decided to 
add 3 more out riggers per side.  This dropped the load on each on to 230lbs.  I also realized a was missing a cross 
bar.  I think I changed my order about 4 times but Joel was patient with
 me.  The rest of my order was finished today, I quickly ducked out of work to pick it up.
Expenses to date $3,928