I finished exams on Saturday, all in all I did very well. The plus side is not I have 3 weeks off to work on the house, oh and that whole x-mas thing.
I've been working on a few odds and ends including that last pieces of wall sheathing. The worst piece was above the bay window, I finally gave up trying to figure it out on the actual sheet of OSB and brought my measurements inside to Sketchup. 10 minutes later I had a print out with all the measurements I needed, and it even fit perfectly! Computers make some things easier.
I also drilled all the holes to extend the threaded rod from the bottom plate all the way to the top plate. I just have to pull the tarps off so I can put the rods in. Unfortunately I only have 8 rods and I need 13. I added a 1/2" rod in each of the front corners, it needs to be welded at the bottom.
The South side has the Typar on but not completely stapled down, I have to sneak under it to cut out the OSB around the windows and door.
I also cut 1 1/2" off the top of the first rafters to allow venting and to put 2x4s in to allow for the outriggers, I'm hopping to get these done tomorrow and then I can start sheathing the roof!
No comments:
Post a Comment