Sorry about the lack of pictures recently but it doesn't look very different. I'm into exams so I have more time but I'm catching up on some non-house related errands and we are having a "cold snap" (highs around -6C/21F).
I'm still putting up wall sheathing as I have time. The bathroom wall is completed with the typar stapled down. The two long walls just have a few small pieces around the wheel wells and typar. The bay window wall has one large piece that needs to be measured, cut and installed.
No comments:
Post a Comment