Wednesday 4 December 2013

Wall sheathing

Sorry about the lack of pictures recently but it doesn't look very different.  I'm into exams so I have more time but I'm catching up on some non-house related errands and we are having a "cold snap" (highs around -6C/21F).

I'm still putting up wall sheathing as I have time.  The bathroom wall is completed with the typar stapled down.  The two long walls just have a few small pieces around the wheel wells and typar.  The bay window wall has one large piece that needs to be measured, cut and installed.

No comments:

Post a Comment