Around 11 last night we had a storm come through. The shelter was flexing significantly so I had to pull the tarps down and recover the trailer. All the insulation got rained on while I was doing this. Luckily the rock wool is hydrophobic. This morning I vacuumed up the water that was still sitting on the batts and the little that had soaked in. Had this been fiberglass I would be pulling it all out and replacing it.
Sunday, 29 September 2013
Vacuuming insulation
Around 11 last night we had a storm come through. The shelter was flexing significantly so I had to pull the tarps down and recover the trailer. All the insulation got rained on while I was doing this. Luckily the rock wool is hydrophobic. This morning I vacuumed up the water that was still sitting on the batts and the little that had soaked in. Had this been fiberglass I would be pulling it all out and replacing it.
Saturday, 28 September 2013
Insulating the floor
First as promised, my sketchy rain shelter. It won't stand up to snow but the roof should be on before then. The center beam is made up of two 2x4x14s butted up end to end and a 2x4x8 spanning the joint. Hopefully there is no wind.
It was pretty hairy putting this up and it included almost having the main beam dropping onto the solar panels. It will be a lot easier taking it down.
I spent Friday and today putting the insulation in for the floor. My first choice was wool from Oregon Shepard but they didn't reply to my inquiries. I ended up going with rock wool and here are my reasons:
My little spreadsheet to help my choice
Now the fun part, installing it. I wore long sleeves, leather gloves and a mask. Rock wool is nowhere near as itchy as fiberglass and it washes off much easier. I found it would give slivers without the gloves. I've finished installing 3 1/2 bags out of five.
It was pretty hairy putting this up and it included almost having the main beam dropping onto the solar panels. It will be a lot easier taking it down.
I spent Friday and today putting the insulation in for the floor. My first choice was wool from Oregon Shepard but they didn't reply to my inquiries. I ended up going with rock wool and here are my reasons:
- loose fill has a lower R-value per inch
- loose fill has to fluffed up
- fiberglass is itchy and has a slightly lower R-value
- rock wool is pretty dense and will probably resist settling and shifting
- rock wool is fairly water resistant
- rock wool was $220 vs fiberglass $130
My little spreadsheet to help my choice
| Floor insulation | |||||
| Cubic ft needed | 92 | ||||
| ruxul loose | ruxal batt | FG loose | FG batt | Cellulose | |
| Coverage/pkg in cubic feet | 22.49 | 18.24 | 56.63 | 35.89 | 18.12 |
| Cost/pkg | 34.47 | 36.38 | 36.20 | 43.66 | 14.22 |
| Weight/pkg | 33.00 | 42.10 | 30.00 | 29.90 | 25.35 |
| R/inch | 2.82 | 4.00 | 2.70 | 3.64 | 3.33 |
| Weight/cu ft (lbs) | 1.47 | 2.31 | 0.53 | 0.83 | 1.40 |
| Cost/cu ft | 1.53 | 1.99 | 0.64 | 1.22 | 0.78 |
| Cost/R | 0.045 | 0.042 | 0.020 | 0.028 | 0.020 |
| Weight total (lbs) | 134.51 | 211.56 | 48.57 | 76.37 | 128.24 |
| Bags needed | 5.00 | 6.00 | 2.00 | 3.00 | 6.00 |
| Cost | 172.35 | 218.28 | 72.40 | 130.98 | 85.32 |
Now the fun part, installing it. I wore long sleeves, leather gloves and a mask. Rock wool is nowhere near as itchy as fiberglass and it washes off much easier. I found it would give slivers without the gloves. I've finished installing 3 1/2 bags out of five.
Thursday, 26 September 2013
Procrastination
There are times that I just don't feel like working on my projects. The last month has been one of those times. I have my excuse, waiting on the SIPs, starting school and a couple more. The truth is moving off the floor is another reality check. Do I really want to do this?
Those who have met me know I look at things in a different way. Odd might be a popular description. I've always though that most of society is not overly happy so why should I follow the herd? But I like the herd
Well enough philosophical musings back to building!
September has been another wet month and winter is fast approaching. I spent the whole day building a frame to hold up some tarps so I can start on the walls, even if it is raining!This pictures was taken at 7:30, the sun is going down so early. I'll post another one tomorrow when there is light
Expenses to date: $6,347
Wednesday, 11 September 2013
More posts coming soon
I'll be soon back to work on the house but here is a little summary of the past 3 weeks.
First, I got a second quote for the SIPs and it was $9000 with taxes in, about the same price as the other quote. As much as I would like to use SIPs, I can't justify spending and extra 4-5,000 on them. Now I have to rework the plans to go with a conventional stick build.
Second, I spent 5 days on my motorcycle touring around Washington state and Victoria island. It was awesome.
Third, I started school!
Finally, I sold my 28 foot toy hauler and had to drive it to Edmonton to meet the buyer. With school and building the tiny house eating up a lot of cash the sale gives me a good buffer.
Two small updates. I was given a second induction cook top for free! I just bought a used 2500 pure sine wave inverter for 225! Now I can run all the tools off the battery bank.
Expenses to date: $6,019
Here is my spreadsheet of expenses
First, I got a second quote for the SIPs and it was $9000 with taxes in, about the same price as the other quote. As much as I would like to use SIPs, I can't justify spending and extra 4-5,000 on them. Now I have to rework the plans to go with a conventional stick build.
Second, I spent 5 days on my motorcycle touring around Washington state and Victoria island. It was awesome.
Third, I started school!
Finally, I sold my 28 foot toy hauler and had to drive it to Edmonton to meet the buyer. With school and building the tiny house eating up a lot of cash the sale gives me a good buffer.
Two small updates. I was given a second induction cook top for free! I just bought a used 2500 pure sine wave inverter for 225! Now I can run all the tools off the battery bank.
Expenses to date: $6,019
Here is my spreadsheet of expenses
| Trailer | 3410 |
| Framing | 907 |
| Tool | 800 |
| Appliances | 315 |
| Electrical | 225 |
| Siding | 141 |
| Batt box | 129 |
| Plumbing | 93 |
| Date | Description | Store | Category | 6019.52 | |
| 18-May | Trailer | Castanet | Trailer | 2,800.00 | |
| 3-Jun | Grinding discs | Princess auto | Tool | 13.42 | |
| 9-Jun | Caulk gun | Home Depot | Tool | 68.59 | |
| 15-Jun | Lumber floor joists | Home Depot | Framing | 103.34 | |
| 15-Jun | Tools | Princess auto | Tool | 78.92 | |
| 15-Jun | Metal | Spartan Metal | Trailer | 350.00 | |
| 18-Jun | OSB - floor bottom | Home Depot | Framing | 119.56 | |
| 18-Jun | Flashing floor bottom | Home Depot | Framing | 144.48 | |
| 18-Jun | PL premium | Home Depot | Framing | 11.85 | |
| 18-Jun | Mason Line | Home Depot | Tool | 5.03 | |
| 23-Jun | Plywood sub floor | Home Depot | Framing | 174.38 | |
| 23-Jun | 2x4s | Home Depot | Framing | 19.62 | |
| 23-Jun | Spray paint gun | Princess auto | Trailer | 22.39 | |
| 24-Jun | Battery Tub | Walmart | Batt Box | 16.80 | |
| 29-Jun | Battery box paint | Canadian Tire | Batt Box | 37.61 | |
| 29-Jun | Strong ties, vent | Home Depot | Batt Box | 14.68 | |
| 29-Jun | Trailer Paint | Home Depot | Trailer | 51.00 | |
| 4-Jul | Battery box security | Home Depot | Batt Box | 37.34 | |
| 8-Jul | Welding supplies | Reliable welding | Trailer | 2.20 | |
| 8-Jul | Welding magnet | Summit tools | Trailer | 2.21 | |
| 9-Jul | Welding supplies | Princess auto | Trailer | 7.86 | |
| 10-Jul | Welding gas | Praxair | Trailer | 71.11 | |
| 10-Jul | Welding wire | Princess auto | Trailer | 33.59 | |
| 11-Jul | Paint supplies | Home Depot | Batt Box | 11.70 | |
| 11-Jul | Screws | Home Depot | Framing | 56.50 | |
| 11-Jul | PL premium | Home Depot | Framing | 11.85 | |
| 11-Jul | Gerry Can 10L | Canadian Tire | Tool | 10.07 | |
| 11-Jul | Generator 3500W | Home Depot | Tool | 446.88 | |
| 12-Jul | Gas | Chevron | Tool | 13.00 | |
| 12-Jul | Compressor oil | Princess auto | Tool | 14.55 | |
| 14-Jul | Induction cook top | Walmart | Appliances | 90.98 | |
| 20-Jul | PT lumber | Home Depot | Framing | 32.08 | |
| 20-Jul | PL premium | Home Depot | Framing | 11.85 | |
| 24-Jul | Dishwasher | London drugs | Appliances | 223.99 | |
| 27-Jul | Screws | Home Depot | Framing | 23.95 | |
| 27-Jul | Lumber | Home Depot | Framing | 44.65 | |
| 27-Jul | 10" miter saw | Home Depot | Tool | 113.96 | |
| 27-Jul | Wasp killer | Home Depot | Tool | 7.71 | |
| 29-Jul | Wheel bearings | Lordco | Trailer | 69.68 | |
| 4-Aug | PT lumber | Home Depot | Framing | 8.02 | |
| 5-Aug | Waste plumbing | Home Depot | Plumbing | 84.38 | |
| 6-Aug | Tie downs | Home Depot | Framing | 41.48 | |
| 8-Aug | PT lumber | Home Depot | Framing | 22.76 | |
| 8-Aug | PT lumber | Home Depot | Framing | 11.73 | |
| 9-Aug | Waste plumbing | Home Depot | Plumbing | 7.43 | |
| 13-Aug | Screws | Home Depot | Framing | 25.94 | |
| 15-Aug | Squeegee | Canadian Tire | Batt Box | 11.19 | |
| 15-Aug | House wrap | Home Hardware | Siding | 141.10 | |
| 15-Aug | Staples | Canadian Tire | Tool | 4.80 | |
| 15-Aug | Sharpie | Superstore | Tool | 5.59 | |
| 16-Aug | Bolt | Home Depot | Framing | 0.62 | |
| 16-Aug | Sewage coupling | Home Depot | Plumbing | 1.11 | |
| 26-Aug | Stack Jacks | Walmart | Framing | 41.99 | |
| 1-Sep | Staple gun | Canadian Tire | Tool | 35.27 | |
| 1-Sep | Plumbing returns | Home Depot | Tool | (18.26) | |
| 11-Sep | Prosine 2.5 | Castanet | Electrical | 225.00 |
Wednesday, 21 August 2013
Why I did not build with SIPs.
I got the estimate back for the SIPs yesterday. I expected it to be in the 3,000 to 5,000 range. I opened the email and saw $9,200!!!! =O
This morning I called another company, they where nice enough to give me some numbers so I could ball park the cost. This time it came to about $7,000 with a 6 to 8 week delivery time. (Edit this second estimated ending up being $9,500)
I did up a spread sheet to estimate how much a stick build would cost. I included sheathing, framing, insulation, vapor barrier and a large cushion. My estimate is $3500.
I love spreadsheets.
I've been using one to track my expenses so I just added a few numbers for the siding and windows to get my "dry in" price. With SIPs I would be around $19,000, stick build $15,500. Add on plumbing, electrical, cabinets and it starts to add up. Granted I'll have more time to look for bargains which would help.
This morning I called another company, they where nice enough to give me some numbers so I could ball park the cost. This time it came to about $7,000 with a 6 to 8 week delivery time. (Edit this second estimated ending up being $9,500)
I did up a spread sheet to estimate how much a stick build would cost. I included sheathing, framing, insulation, vapor barrier and a large cushion. My estimate is $3500.
I love spreadsheets.
I've been using one to track my expenses so I just added a few numbers for the siding and windows to get my "dry in" price. With SIPs I would be around $19,000, stick build $15,500. Add on plumbing, electrical, cabinets and it starts to add up. Granted I'll have more time to look for bargains which would help.
Tuesday, 20 August 2013
Done and done
Crossed a couple of long standing items off the list today. I installed the flashing for the front bay window and welded on the last 4 anchors. Moving into the home stretch for the floor :-)
The SIPs will not be ready for a couple of weeks and I'm running out of things to do so I've decide that I'm going to head out on the bike for a week. Vancouver island is the leading candidate. This is my list of what is left to do:
Seal gaps
Typar on bay window
Secure plumbing
Paint new welds
Insulation
Vapor barrier
Deck sheathing
Seal gaps
Typar on bay window
Secure plumbing
Paint new welds
Insulation
Vapor barrier
Deck sheathing
Monday, 19 August 2013
Delay on account of SIPs
I spoke with the SIPs company last Friday. I was told the earliest I would be able to get the SIPs is the first week of September. It took the wind out of my sails. I didn't order them sooner because I wanted to floor mostly done so I could make sure my model matched what I had built. Good thing too because the house is 1" shorter then it should be.
I also spoke with a company that provides wool insulation last week and still have not heard back from them. I guess I'm going with fiberglass.
I spent the last few days mostly relaxing with family but I did finish all the flashing on the bottom of the trailer. I also wrapped each of the outriggers in typar (like tyvek).
With the outrigger upside down
And on it's side
The wasps have been really bad and the spray has not done it's job. I tried to buy a wasp trap today but all the stores where sold out so I bodged together one. I'll let you know if it works.
Expenses to date $5,761
I also spoke with a company that provides wool insulation last week and still have not heard back from them. I guess I'm going with fiberglass.
I spent the last few days mostly relaxing with family but I did finish all the flashing on the bottom of the trailer. I also wrapped each of the outriggers in typar (like tyvek).
With the outrigger upside down
And on it's side
The wasps have been really bad and the spray has not done it's job. I tried to buy a wasp trap today but all the stores where sold out so I bodged together one. I'll let you know if it works.
Expenses to date $5,761