Even though rock wool is less itchy then fiberglass I still hate insulating. I need the insulation in place before the fascia goes on. This will allow me to cram extra insulation behind the fascia to make sure I get good coverage. At this point I wish I had spent more time looking at spray foam.
Because I added the collar ties its taking longer to make all the cuts in the insulation.
I was excited to pick up the metal roofing. I like the red :)
Expenses to date: $19,197
Saturday, 31 May 2014
Thursday, 29 May 2014
The detachable eaves
I just finished installing the brackets for the removable eaves. The next step was to mark the fascia and drill holes. I ruined the first set of fascia boards and on the next set I decided to mark them in place.
It worked like a charm! I only had to slightly correct a few holes. Next stop insulating the roof!
It worked like a charm! I only had to slightly correct a few holes. Next stop insulating the roof!
Tuesday, 27 May 2014
SIPs vs Stick final costs
The total cost of the wall and roof framing, including insulation and vapour barrier, came to $3,458. This level of completion is similar to what a SIP build would be. Back in August 2013 I had estimated that a it would be $3,500, which makes me pretty bang on.
I would have liked to have built with SIPs but the $9,000 to $10,000 quotes where way too much money. Granted I would have been finished the house by now.
All in all I'm happy with my decision to stick build.
I would have liked to have built with SIPs but the $9,000 to $10,000 quotes where way too much money. Granted I would have been finished the house by now.
All in all I'm happy with my decision to stick build.
Sunday, 25 May 2014
Finished doors and windows
My brother had time this weekend to help me finish installing the windows and even the door. It's finally starting to look better.
As a bonus my roofing has arrived and I'll pick it up later in the week.
As a bonus my roofing has arrived and I'll pick it up later in the week.
Thursday, 22 May 2014
Installing more windows
Yesterday I prepped the rest of the window openings for the windows and today my brother came over again to help with the install. My new view.
I also managed to re-frame the door opening and I'm hoping to get that in soon too.
I also managed to re-frame the door opening and I'm hoping to get that in soon too.
Tuesday, 20 May 2014
Installing the windows
Drilling holes in my window frames. Does that void the warranty? :-)
My brother came over and helped me install these 5 windows today. I'm impressed with how it changes the look.
After he left I prepped the loft window openings
Expenses to date: $18,729
Monday, 19 May 2014
Door and Window Sensors
The sensors came in :)
I popped over the boarder again to grab them. The sensors will run at 12v but the Spark Core operates a 3.3v, this meant I had to do a little circuit design to keep from frying the Core.
The Core's will be the interface between a computer and all the house's sensors, lights and appliances.
Expenses to date: $18,697
I popped over the boarder again to grab them. The sensors will run at 12v but the Spark Core operates a 3.3v, this meant I had to do a little circuit design to keep from frying the Core.
The Core's will be the interface between a computer and all the house's sensors, lights and appliances.
Expenses to date: $18,697
Subscribe to:
Posts (Atom)











