First Month Living in the Tiny House

I have to say that after living in a not-quite-finished tiny house for a month I love it.  It may be cluttered but the size feels right.

The last 3 weeks where incredibly busy with work and trying to get the house livable. For most of time I was using a pop bottle to shower, it was only on the 2nd last day that I had a working shower (it was awesome!).  I'm taking a 6 week break from the house and I won't be able to do very much when I get back so the pressure is on.

I'm going try to take pictures when I get back into the house of all these projects


Stained and installed almost all of the siding

Plumbed all the gas lines using black iron and copper lines

Installed the stove, furnace and hot water tank




Installed the kitchen sink

Installed most fresh water lines

Plumbed the shower

Built a rough outline of the cabinetry



Tuesday, 10 June 2014

So many things

I've been working 10 hour days for the last couple of weeks so lots of updates.
 
Finished installing the loft roof installation and most of the main roof.


This allowed me to make progress on the fascia boards.  I started by painting them and drilling a ton of holes for the roof venting.  I could have bought plastic vents but it would have cost about $120.  To drill the holes quickly and accurately I made a jig out of a 2x4 on the drill press. I stapled screening on the back side to keep bugs out.

One down, three to go

I put most of the roofing on.  I just have a few pieces left to install but it will keep the rain out.  I used ladders for the loft area but ending up renting scaffolding to do the rest.  It was cheap ($50) and made the job way easier, faster and safer.  My roommate what kind enough to paint my front door for me.



I finished off today by staring on the shower install.  I put 1/8" board behind it to protect the vapour barrier and cut the hole in the floor for the drain.  It's a big shower but it just fits in.



I've also picked up the siding and interior wall covering.  Both need to be painted, so much work to do before I move at the end of the month.

Expenses to date: $20,957



Wednesday, 7 May 2014

Getting the shower in


I just arrived back from another 2 day trip to the states, my last 3 windows where ready for pickup!  While I was down there I took a second look at doors and ended up picking up this printable fiberglass door with a left inward swing and in the right size.
 

I've been looking for a one piece 36x36 that was less then 76" tall.  While in home depot I found one in stock!  I ended up going back on the second day and just paid the extra taxes at the boarder.  They gave me a bit of a deal because of the problems with windows.

When I got the shower home it would not fit thru the door and after a looking at every possibility I decided that I would have to make a hole in the roof.  It took about 6 hours to remove one rafter, part of the roof decking, hoist the shower over the wall and then put everything back.


Ta da!

Expenses to date: $17,930

Thursday, 13 February 2014

Putting holes in the walls

I've been busy putting up the wall insulation and I'm about 3/4 done.  Just a few thin strips next to the interior wall, a couple of spots in the loft and between the door and the bay window.  I'll be putting vapour barrier up over the covered areas tomorrow.  The rest has to wait for the bay window.

 It looks so nice and even :)

 Putting holes in the north wall, nervous and exciting.  Furnace on the left and water heater on the right.

Water heater hole

I also wired up the electrical box the rear exterior plug.


There are two things that are really holding me up, the lack of bay window walls and I have to make the brackets for the 8" roof extensions.  These will allow the roof to be 9' 10" wide when parked.  I'm going to tackle the brackets first.  Once those are done then i can insulate the roof.
There is a total of 40 that I have to make.  That is whole lot of welding and cutting.

Expenses to date $12,028

Wednesday, 1 January 2014

Loot for the house

Happy New Year!


My brother was in town for the holidays and he was able to lend a hand on the house.  He drilled all the holes for the electrical runs while I worked on the framing around the wheel wells.

I had ordered some thing from American RV and they had arrived at the shipping outlet just across the boarder.  I have to give kudos to them for their pre-sales support. The furnace was not a regularly stocked item and they contacted their supplier to see if they could get it shipped out before the Xmas shutdown.  Things worked out and I had it less then 2 weeks after it was ordered.  There prices where very good too.

The second company that I have to give kudos to is Propane Depot in Vancouver BC.  I forgot to order a second hose and I needed a few more fittings.  The person that helped me was very knowledgeable and even answered my questions about the rest of my propane system.  So if you need anything propane related and you are around Vancouver you should drop in.

A couple of things I learned:
The hoses before the propane regulator should not droop lower then the top 20% of the tank.  If they do propane liquid can form and that may damage the hoses and regulator.
There is no standard for circuit breakers.  Make sure you buy the right ones for your panel.


So here is everything I bought
Square D electrical panel
4 x 20amp breakers
8 x 15amp breakers
20' Copper gas line
CO and propane alarm
Double flare tool
Auto change-over propane regulator, hoses and fittings
Fittings and valves for propane
Atwood 1522 dual stage ducted furnace and door
Suburban 6 gallon gas/electric hot water heater and door


I'll use the electric heater on the hot water heater as a dump load when my batteries are fully charged.  It should save some propane in the summer.


Expenses to date: $10,505

Thursday, 15 August 2013

Flashing, no not that kind!



My roommate, who is being very generous with this time, gave me a hand putting the flashing on the bottom of the floor.  It was messy, hot and tedious.  Even when we got into a rhythm it took about an hour to apply each strip, luckily there where only 4 to do.  We only applied construction adhesive done the side that overlapped the previous piece.  We then screw the flashing at each joist in two places.  The overlap is 6" on a 24" wide flashing.




After take a break I came back and finished dry fitting the sewage plumbing.  I then notched out the joists where the pipe would pass thru and placed everything.  The slope is about 1/4" per foot.  Everything looks like it will work.  I had to cut a hole in the plywood to make room for the shower trap.  I'll be adding about 4" of insulation under it to keep it from freezing in the winter.


Expenses to date $5,571

Tuesday, 6 August 2013

Sewage revisited

Today was a good day!
I started off my going over to my brother's to cut all the threaded rod for the tie downs. Next I took a second look at the plumbing. I guess I was dreaming about plumbing because I quickly came up with a new layout that I think will work much better.  The plumbing now will come out on the proper side too.



In the mid day heat (35C/95F again today with no shade) I tackled the tie downs on the outriggers.  This took me about 3 to 4 hours for just the front outriggers.  I eventually figured out if I drill a pilot hole that it took about 1/4 of the time.  I guess the heat was cooking my brain.

Finally after playing volley ball for a couple of hours I finished off by trimming down the sides of the floor plywood on the rear section.  I had originally made it tight would the frame but this did not allow space for the welds so the joist where not level with the outriggers in this area.  I had to jack up the floor, unscrew the plywood, slide it out and trim about 1/4" off.  Rinse and repeat for the other side and now just the last two are out.
The front joist I'll fix by putting shims under where it sits on the frame, this joist will be supporting the shower and battery banks so I'm being picky.  The rear 2x4 joist sits on the rear bumper and is out by a fill 3/8".  I'm be replacing it with a 2x6 that I will pass thru a table saw to get the right height.  It's more work then cutting a strip of 3/8 OSB but its also the right way to fix it.



Expenses to date $5,503

Monday, 5 August 2013

Plumbing

I broke new ground today, plumbing!  I started on the layout for the sewage lines.  It's kind of like lego but all the pieces are round.  The layout I came up with has the sewage line exiting the house on the passenger side of the trailer.  If you have ever owned an RV you know this is the wrong side but with the shower and kitchen sink on that side this layout probably works the best.
After playing around with the layout I moved back to working on the framing for the front outriggers.  It was slow but I finished both of them before calling it a night.

Expenses to date $5,462

Monday, 1 July 2013

Happy Canada Day!

More of the same. I finished placing all the living room outriggers!  Everything looks level, fingers crossed!  The rear outriggers have to support the extra weight of the loft so they have to be closer together (12" vs 30").




Here is the detail for the joist hangers.  To make more room to keep the waste water pipes from freezing I'll be using 2x8s under the bathroom instead of the 2x6s used under the rest of the floor.